Thursday, May 12, 2016

Course Notes and Happenings, 5/12/16


While the beginning of May has been inconsistent weather wise, it has been nice to see members out and about enjoying the golf course when it is nice and sunny.  All stump holes have now been filled and seeded or sodded, and until these areas establish themselves, they will be marked as ground under repair.


Hydro leak on 4 fairway
Unfortunately, we had a hydraulic hose blowout on one of our sprayers today, along the left side of #4 fairway.  The oil line was directly behind the operator and was not noticed until it was too late.  As often as we check all of our machines for wear and tear, these things happen sometimes.  The affected sod will be cut out and replaced within the next week or so.  It is interesting to note that it is not the oil itself that kills the turf, but the high temperature that the oil is at during normal operation.  There is never a good time for this to happen!
Sand sieve tool

Rocks after one scoop, 7 fairway bunker
Many of you have asked about all the pebbles and rocks in the bunkers.  These rocks come from the subsoil base of the bunker, in one of three ways.  The first is from the multiple freeze/thaw cycles that occur during winter, where soil heaves up and down, pushing the rocks closer to the surface.  The second way these that come up is via any washout damage that occurs during a heavy rain event.  Lastly, our hand rakes and machine rake can grab rocks that are below the sand surface and bring them to the top.  

We have purchased sifting tools to lessen the impact these rocks have on the playability of the bunker.  Throughout the year, it is my goal to have our staff comb through with these tools and remove as many as possible in the top 2" of the bunker.  In April, 18 5 gallon buckets of rocks were removed.  

14 Pond
 Finally, I mentioned in the Prattler our wood duck house on #14 Pond has a resident wood duck sitting on 9 eggs.  Over the next 2 weeks or so I am hoping to capture their hatching and subsequent "jump day" when the new ducklings learn that their nest is 7 feet above the ground.  If you would like more information on wood ducks, The Wood Duck Society has a great FAQ section here.

If you have any questions, please email me at ryan@elconacc.com.  Thanks and have a great rest of your week!

Ryan


Our resident mama wood duck










Tuesday, April 26, 2016

Tis the Season!

Golf shop entrance tulips
Spring finally sprung here in the last month, so apologies for the delay between blog posts.  The staff and I have been quite busy preparing beds, bunkers, and turf into the in-season shape that they are accustomed to.  Seeding and sodding of areas left from our winter tree work should be wrapped up next week.  One large item we accomplished is Elcona's renewal application to be one of 6 Certified Golf Course Sanctuaries in the state of Indiana.  I am quite proud of the club's accomplishments within the last two years, from helping care for the Seed to Feed garden, to planting wildflower areas for increased pollinator habitat, to being smarter users of water and inputs to maintain the golf course.  We should hear in July if Audubon International agrees with my sentiments, and I will keep you posted.

Harold Marner on 16 aerifying
Steve Ott in the snow on 16
 Our staff completed aerification earlier this month, in less than ideal Spring Break weather.  I tell people time and time again how lucky I have to have such dedicated staff members.  A special thank you to Steve Ott and Harold Marner for sitting on the tractors for a couple of quite testy days outside.

Check plot on #13
Close up of seed heads
 Finally, I am sure you have noticed that the "Seeding Season" is here for the Poa that composes the majority of turf on the greens. As great as Poa annua is as a putting surface, one drawback is its annual seedhead production.  Poa annua is a winter annual, meaning it germinates in the fall, overwinters, and produces seeds in the spring for its next generation.  Think of Poa as a backwards annual flower you would plant in your landscape. 

Poa seedhead production
Plywood used to create check plot on #1
Using a temperature based schedule, we have applied three applications of growth regulator to suppress, not eliminate, these seedheads from impacting ball roll.  As the first picture to the left shows, I left 5 areas on the course untreated, as a check plot, to assess the success of this year's applications.  All of the checkplots show we have had a reasonable amount of success in limiting the amount of seeds impacting play.  SInce the process is not perfect, we try to further reduce their impact with topdressing applications and additional rolling.

If you are interested, the check plots on located on the large practice green, #1, #10, and #13 green.  If you have any questions, please contact me at ryan@elconacc.com.  Thanks, and have a great week!

Ryan




Thursday, March 10, 2016

Time for Golf!


#7
I am happy to announce that the golf course will open on Friday, March 11 at 12 p.m. for play.  Tee times will begin at 9 a.m. this Saturday and Sunday.  The staff has done a great job with the clean up from winter's wrath, and the turf has started to show some growth thanks to well above average temperatures.  Over the next few days, we will begin mowing and rolling playing surfaces, and getting the bunkers back in shape in anticipation of a great 2016 golf season at Elcona.

15 green
One note of caution:  As we have focused solely on debris clean up, we have still many empty stump holes and areas where we have ground roots down that need to be filled with soil.  These areas will be flagged or roped so that they are easily identifiable for you, and they should be treated as ground under repair.  We will begin filling them next week, starting with the areas closest to the normal route of play.  If you have any questions, please email me at ryan@elconacc.com, or call the maintenance facility.  I hope to see you out on the golf course this weekend!
Roots being ground from the cart path exit at 15 tee

Ryan

Stump hole on #2.  Caution around these! 

Monday, March 7, 2016

Course Update, 3/7/2016

As the warmer than normal temperatures swing into our area this week, we are in total clean up mode.  As much as possible through the winter, we try to keep up with the downed sticks and debris that come with winter's sometimes howling winds.  This clean up takes the staff and I about 2-3 days. Snow is still present in shaded areas and hopefully will be gone by this afternoon.  With virtually no frost in the ground, drainage from rains and melting snow should be open, albeit at a slower pace. Rest assured, Tom and I will open the golf course when it is playable and the risk of traffic damage is minimal.  Golf is coming soon!

Old fence was tired!
Kyle and Greg working on the fence
Finished product on the south side

While the ground was thawing, the staff and I worked on a couple of other projects that may not directly impact the golf course, but were welcome changes that indirectly impact our operation.  First, some of you may have noticed that the split rail fence around the Miles Barn on the north end of the property was deteriorating rapidly and was in need of replacement.  With increased event bookings for that beautiful Elcona feature, it was time to improve the aesthetics of the surrounding area.  That replacement is complete on the north and west sides of the barn, with a few additional rails needed on the side facing the practice facility.  The fence turned our great in my opinion.

Digital job board in the Maintenance Facility
We also added a digital job board to our facility.  As many of you know, I love technology and applying any impactful uses to our operation to increase productivity.  This job board allows myself and our assistants to plan our staff's tasks from anywhere in the world, via cloud based Google Docs. If we see the need to change tasks mid morning, we can change the job board in the field at a moment's notice, instead of chasing staff all over the golf course to communicate changes, driving back to the shop to change the board, and/or taking additional time away from course set up or whatever tasks the morning requires.

This board also gives us the ability to perform more impactful training presentations in regards to operational and safety practices, club events, and the ability to communicate real time weather and radar information.

If you have any questions about these projects or anything about the golf course, please email me at ryan@elconacc.com.  Stay tuned for any information regarding the opening of the course.  It is coming soon!  Have a great day,

Ryan