Pages

Tuesday, May 30, 2017

Course Notes, 5/30/17



Compared to a typical May, 2017’s version was colder, wetter, and busier than normal (the latter being a good thing!).  Our staff is doing a wonderful job with projects, both on and off the golf course.  Here is a quick recap of our observations and activities in the last month:

A low of 28 on May 8th
Orange tinge to fairway turf
Close up of 17 fairway turf showing tip burn/old leaves
The cold weather in early May (including morning lows below 30 degrees on May 5th and 8th) was not a welcome sight for the turfgrass in the fairways and green surrounds.  Many of you have asked me about the orange tinge you saw when looking at a fairway from afar, while it looked green when on the fairway.  The pictures of 17 fairway close up showed the orange is actually the tips of the leaf blades and the old leaf blades, with greener, healthier turf growing below.  The variety of bentgrass we have in our fairways is an older variety that is quite susceptible to cold temperatures.  The two freezes we had earlier in the month stunted the turf’s growth, and would not push new growth until more consistent warmer weather returned, which in the last few days has.  Green surrounds have finally shown growth and have received their 2nd fertility application to provide consistent food for the next 90 days.

The staff also has concentrated on detail work in the bunkers and tees.  We rented a plate compactor to further firm up bunkers that have had new sand installed within the last 2 years, and sifted through the sand to remove as many rocks as possible.  It continues to amaze me the amount of rocks that consistently make their way up from the subsoil to the surface through washouts, frost heaving in the winter, and maintenance practices.  Four 5 gallon pails were removed on the bunkers on holes 7 and 16 alone.  Removal of these impediments will continue to be a priority for our staff.  Tees were verticut last week to remove excess growth and thatch. We will continue to work on firming up these playing surfaces.
Plate compacting bunker edges
Tees after verticut and regular mow

Rocks removed from 1 bunker on 7
Lots of material removed from tees!

Finished bunker on 5
The Fiesta Hut project is completed and I couldn't be happier on the resulting product.  With the wet weather, our concrete contractor has fallen a bit behind on his work and as soon as he can, they will be out to finish patching the walkway around the new stone wall. When you see him, please thank Greg Stump for his efforts on this project, and his other transformations around Elcona.  He is currently in full planting mode, adding tremendous color to the Elcona landscape.


Finally, NiBlock was out earlier in the month to refurbish the cart paths in the woods, 7,11, and Halfway House, and did a wonderful job.  The staff is currently planting grass seed and landscaping around the Halfway House, and as course needs allow, we will be adding soil and seed to the shoulder areas that need raised up.





If you have any questions, please contact me at ryan@elconacc.com.  Thank you, and I will see you out on the golf course!


Ryan

No comments:

Post a Comment