Showing posts with label cart path wear points. Show all posts
Showing posts with label cart path wear points. Show all posts

Thursday, June 16, 2016

Course Notes, 6/16/2016

The staff has done a fantastic job in the last month getting and keeping the golf course in great condition, and are now finalizing details for next week's hosting of the Indiana State Amateur Championship.  Yesterday's .42" of precipitation brought our total rainfall received at Elcona to .96" since May 17th.  While helpful, yesterday's rain didn't saturate the golf course and we could use more.
#5's Burr Oak and leaves shedding
Something you may have noticed this year is how many trees are dropping leaves, like our Burr Oak "Gus" on #5.  This is a natural response to dry conditions.  When the tree senses that there is not enough water to satisfy its needs, it will drop some leaves in an attempt to conserve water for its overall long term health.

The new #10 Green Tee
The staff and I have also completed a couple small, but impactful projects in the last week.  The green tee on #10 was expanded and squared off to create additional hitting area for those players, and to create a more classic looking tee. The voids will fill in over the next few weeks to complete to project.

Also, the cart path ends at 9 tee and 10 tee were regraded and sodded to create a much smoother transition from asphalt to turf.  These ends will be roped off until the sod is rooted down, so please use caution and drive around those areas until they are ready for traffic.

10 Tee Cart Path end
If you have any questions, please email me at ryan@elconacc.com.  Thanks, and have a great rest of you week!

Ryan


Monday, November 9, 2015

November Course Notes and Happenings


While the leaf colors exceeded beauty and expectations, they are dropping as fast as we can mulch them.  As I sit in my office on this frosty morning, I estimate we are about 70% done with this quite time consuming process.  The contrast in colors this time of year between turf and leaves are spectacular though!  Here's hoping that we have a few days this month for all of you to come out and enjoy the golf course.

The Vertidrain process on #9
Our contractor was out on November 2nd to Vertidrain our greens.  This process is a solid tine aerification that reaches a depth of 8-9 inches.  The benefits of this late season process is to create channels for new root growth and late fall/early spring drainage.  This process also further smoothed the greens from October's core aerification, and we applied an additional 20 tons of sand as well to fill in any open areas.





Map of Indiana's Drought status, as of 10/27/15
A few of you were asking why the October core aerification was slow to heal this year.  There are a few reasons why our greens are slower to heal perhaps compared to other courses in the area, no matter the frequency we roll them or amount of fertilizer or water we apply.  One major reason is that the turf composition on the greens are 80-90% Poa annua, whose growth habit is non-spreading, unlike Creeping Bentgrass, which is the main turf composition on tees and fairways here. The other major factor is the schedule of timing of this necessary practice.  October soil temperatures are 15-20 degrees on average below those of September, and we lose over 90 minutes of daylight over the course of the month.  The 2 mornings where the low was below freezing really slowed down both the metabolism and growth rate of the plant!  Finally, October was quite the dry month here, where most of Elkhart County is considered now in a moderate drought situation.  Rain water is 10x more acidic than our irrigation water, and that increased acidity makes additional nutrients available to the plant in the soil. Hopefully this provides a bit of agronomic reasoning behind the healing process and its timing.  If you have any further questions, please feel free to contact me either at 574-295-6374 or by email at ryan@elconacc.com.  I am more than happy to discuss anything golf course related!

We do have a couple of small projects that the staff and I have or will be starting this month, along with beginning our annual tree work.  The first project involved the cart path entry at 10 green.  All of you have noticed the poor turf conditions that exist at the beginning of that path due to the heavy traffic from both maintenance equipment and golf carts.  What we did here is utilize old rubber matting from Chef Casey's kitchen and placed it at the main entry point, then covered it with a soil/seed mixture.  The thought here is to allow the mat to absorb the brunt of the weight associated with the traffic and allow for increased turf density and vigor there.  The seed will germinate next year and we will use this area as an experiment that hopefully will allow us to learn how to better manage these areas.
Mats placed in hole below turf surface
Poor turf and soil removed at entry point
Seed/soil mix filled on top for new turf
We also are building a new forward tee on the right side of #2, just before the beginning of the fairway.  The new tee will measure 320 yards to the center of the green.  The white tees will then move permanently where the forward tees are located currently.  I will have more information and pictures on this project later this month.



Ryan