Showing posts with label Fiesta Hut project. Show all posts
Showing posts with label Fiesta Hut project. Show all posts

Tuesday, May 30, 2017

Course Notes, 5/30/17



Compared to a typical May, 2017’s version was colder, wetter, and busier than normal (the latter being a good thing!).  Our staff is doing a wonderful job with projects, both on and off the golf course.  Here is a quick recap of our observations and activities in the last month:

A low of 28 on May 8th
Orange tinge to fairway turf
Close up of 17 fairway turf showing tip burn/old leaves
The cold weather in early May (including morning lows below 30 degrees on May 5th and 8th) was not a welcome sight for the turfgrass in the fairways and green surrounds.  Many of you have asked me about the orange tinge you saw when looking at a fairway from afar, while it looked green when on the fairway.  The pictures of 17 fairway close up showed the orange is actually the tips of the leaf blades and the old leaf blades, with greener, healthier turf growing below.  The variety of bentgrass we have in our fairways is an older variety that is quite susceptible to cold temperatures.  The two freezes we had earlier in the month stunted the turf’s growth, and would not push new growth until more consistent warmer weather returned, which in the last few days has.  Green surrounds have finally shown growth and have received their 2nd fertility application to provide consistent food for the next 90 days.

The staff also has concentrated on detail work in the bunkers and tees.  We rented a plate compactor to further firm up bunkers that have had new sand installed within the last 2 years, and sifted through the sand to remove as many rocks as possible.  It continues to amaze me the amount of rocks that consistently make their way up from the subsoil to the surface through washouts, frost heaving in the winter, and maintenance practices.  Four 5 gallon pails were removed on the bunkers on holes 7 and 16 alone.  Removal of these impediments will continue to be a priority for our staff.  Tees were verticut last week to remove excess growth and thatch. We will continue to work on firming up these playing surfaces.
Plate compacting bunker edges
Tees after verticut and regular mow

Rocks removed from 1 bunker on 7
Lots of material removed from tees!

Finished bunker on 5
The Fiesta Hut project is completed and I couldn't be happier on the resulting product.  With the wet weather, our concrete contractor has fallen a bit behind on his work and as soon as he can, they will be out to finish patching the walkway around the new stone wall. When you see him, please thank Greg Stump for his efforts on this project, and his other transformations around Elcona.  He is currently in full planting mode, adding tremendous color to the Elcona landscape.


Finally, NiBlock was out earlier in the month to refurbish the cart paths in the woods, 7,11, and Halfway House, and did a wonderful job.  The staff is currently planting grass seed and landscaping around the Halfway House, and as course needs allow, we will be adding soil and seed to the shoulder areas that need raised up.





If you have any questions, please contact me at ryan@elconacc.com.  Thank you, and I will see you out on the golf course!


Ryan

Sunday, April 30, 2017

Course Notes, 4/30/2017

We continue to have great golfing weather for early Spring.  Drier conditions have lead to some nice firm conditions on greens and fairways.  Our staff continue to build in numbers and we have been able to knock out many of our task list for the Spring.   Aerification has come and gone with quick healing and deeper rooting that will benefit the turf when the dog days of summer hit later this year.



Work continues on the Fiesta Hut area.  The staff and I have created the rough grades for the base material that the wall stone will sit on.  Over the course of the next week we will be laying and compacting a 4" layer of gravel as a stone base, and beginning the transformation from empty area to a wall matching the look of the Terrace.  Stay tuned for more updates!



Finally, as part of our Audubon community outreach program, Elcona hosted 120 7th graders from Northridge Middle School for an afternoon of learning on the course, and about the game of golf. This field trip was under the umbrella of The First Green program, which incorporates STEM (science, engineering, math, and technology) learning modules out on the course.  

Each student experienced 6 learning stations:  A geo-caching activity on our trail system (think scavenger hunt with coordinates), an obstacle course meant to simulate the obstacles salmon experience when making their run to spawn, 2 golf stations at the practice facility, a station learning about soils and our rain garden, and a station at 17 green learning how to measure its area.

For many of the staff and students, it was their first time ever setting foot on a golf course, which is what I like so much about this program.  The exposure to a fantastic golf facility and to learn real-life applications to what they are learning about in school are hopefully great memories that will stay with them for life and spark an interest in taking up the game of golf.  The faculty and students were quite impressed with Elcona and its facilities, so much so that we have dates for another visit this coming fall.

If you would like more information on The First Green program, visit www.thefirstgreen.org.  If you have any questions, email me at ryan@elconacc.com.  Have a great week and I'll see you out on the course!