Sunday, October 16, 2011

Renovation of #18 Green: Day 7

Well, it was just a matter of time before our first minor set back.  Today (Sunday) was our first, and hopefully last, rainout of the renovation project.  We were able to get a few slope readings and some smoothing of the surface done before the heavy rain came, but it didn't take long until the green became too difficult work with.

Hopefully the sun and wind make a return trip to the area later today to dry things out so some sod can be installed tomorrow.  With another slight chance of rain on Tuesday and Wednesday, tomorrow has suddenly become an extremely important day.

Giving the green a final prep before the sod goes on.  Unfortunately, this will
need to be done again because of the rainout today.

Saturday, October 15, 2011

Renovation of #18 Green: Day 6

After another visit from Brian Yoder to review the final grade of the green, we are now much closer to putting the sod back on.  Today, a few minor adjustments to the contours of the green were recommended and a final shape was given to the bunker.

Most of the day was spent putting Brian's recommendations into place.  At the end of the day the green is now nearly ready for sod.  Some final raking by hand and another check of the slope percentages are all that need to be done before the sod gets replaced. Click on pictures for a larger view.

Brian Yoder (Black Jacket) showing some of the adjustments
that need to be made.

Bigger adjustments being made to lower tier

Brian adding some finishing touches


Ramon giving the upper tier the "eyeball" test prior to checkng with the laser
Orange paint indicating where the bunker edge will be located 

Friday, October 14, 2011

Renovation of #18 Green: Day 5

Once again, another big step forward after Day 5 was done.  All of the rootzone material has been added back into the greensite and the final contours are becoming more visible.  The irrigation has been re-routed and adjusted to work with the new shape of the green and the bunker is ready for inspection.  Brian Yoder will be back on Saturday to review the final shape of the green and make any necessary adjustments that he deems necessary.

We do not yet have a projected finising date, but it certainly seems that they are well ahead of schedule. Depending on the recommended adjustments, we may be able to put sod on the green at some point this weekend or on Monday.  The bluegrass sod for around the new bunker and the bunker sand will be here on Monday as well.  It is about to get even more hectic than it has been, so try to keep up. I will do my best to keep the updates coming.

Rootzone material being added

Working from the front to the back

View from the front of the green.  Much more of the green is now visible.

Beginning to work on final grading

Installing irrigation to match the new contour of the green

Renovation of #18 Green: Day 4

Today was one of those days where it may not look like a lot of productivity occurred, but we probably took our biggest step yet toward reaching the next phase of the renovation.  Coming into the day, the general shape of the green and bunker had been completed but had not been approved.  Mr. Arthur Hills and his associate, Brian Yoder visited the site to review the work and to make some minor adjustments.  After the visit, there was a definitive plan for the remainder of the project. 

The green took shape right before our eyes as Mr. Hills and Brian Yoder seemingly waved their hands and added subtle contours to the green.  The shape of the bunker from Day 3 to Day 4 took a more dramatic change.  The new bunker will be classified as a "coffin" bunker.  It will have a flat bottom and only a slight amout of sand flashed up on the sides.  I am thrilled with this decision, because the threat of washouts has almost been eliminated.  The grassed face of the bunker will be steep, but maintainable.  Make no mistake about it, this will be a very challenging bunker to go with an equally challenging green.

Ramon from O&J Construction, Mr. Hills and Brian Yoder making adjustments
Adjusting the flow of the transition between levels of the green

Combining the flow of the transition with the outer shape of the bunker
The new shape of the upper tier. Notice the spine running through the
middle of the tier (just like the old green).
The new shape of the transition between levels

The new shape of the bunker coming together.  You're not going
to want to be in this one!